Download a hybrid solar quotation format with battery, protected load, backup and price sections in Excel, Word and PDF.

A hybrid solar quotation has to answer a question that an ordinary on-grid quote can leave open: what keeps running when the grid is unavailable, and for how long under stated conditions? The price alone cannot answer it. Download the blank Excel format, Word format or printable PDF and fill in the actual inverter, battery, protected loads, changeover, installation and terms. These files are ungated and contain no fictional customer or preset battery performance claim.

The format separates module capacity in kWp, inverter power in kW, battery energy in kWh and the estimated protected-load demand in kW. It also makes the battery chemistry, usable capacity basis, operating reserve, transfer arrangement and exclusions visible. If you cannot verify a value from the selected model's current datasheet, leave it pending rather than guessing. The Excel file calculates item totals from your quantity, price and entered GST rate. It does not calculate backup duration or size a battery.

For repeat quotations, Quickest Solar CRM's quotation system can make a branded PDF with your logo, items, terms and product photos and share it on WhatsApp. Create an account if that workflow suits your team. Check current account terms before signing up. ## Download the hybrid quotation format

FileBest useKey review before sending
ExcelBuild the itemised equipment and work price.Check battery model, tax rate, formula totals and PDF export.
WordWrite the backup-load schedule and commercial terms in detail.Recalculate any manually typed amount after revision.
PDFPrint a blank site and quote sheet.Complete it before treating it as a customer offer.

This is a hybrid document, not a renamed general solar quotation. A basic on-grid quote may not include a battery, backed-up circuit or changeover equipment. A hybrid quote must say which loads are protected and what conditions apply. The battery-price guide can help with product-cost research; this page gives you the document in which the selected product and agreed work are priced.

Start with the customer's backup objective

Ask what problem the customer is trying to solve. One household may want lights, fans and Wi-Fi through evening outages. Another may expect air-conditioning or a pump to run. These are very different power and energy requirements. Do not write “whole home backup” because the buyer used that phrase before you checked the connected loads, start-up currents and wiring. Write the actual circuits or appliances that the design will support, the maximum simultaneous demand used for sizing, and any load that must be switched off during backup.

Record the outage pattern and the customer's desired duration, but keep desired duration separate from a supported estimate. Ask whether the customer wants battery charging from solar only, from grid as well, or under a specific priority schedule. The answer may affect equipment choice, settings and the customer's understanding of electricity use. If the customer has an existing generator or UPS, document how the proposed system interacts with it. Do not assume two sources can be connected safely without a reviewed design.

Customer questionWhat to recordWhy it changes the quote
Which loads need backup?Named circuits or appliances, rated and measured power where possible.Determines inverter output and protected-panel work.
How long should they run?Desired hours and the conditions under which that duration matters.Determines required usable energy, not just battery nameplate size.
What can stop during backup?Large or intermittent loads to exclude or manage.Prevents a vague “whole building” promise.
What is already installed?Main board, generator, UPS, meter and wiring arrangement.Can add changeover and integration tasks.
What are the site limits?Battery location, ventilation, mounting, access and cable route.Affects safety, scope and installation cost.

For a small installer, this checklist also protects the sales conversation. The customer can point to the load schedule and say what matters most. You can then quote an option that matches those priorities instead of comparing two battery prices with no shared service definition.

Name the four capacities separately

Hybrid proposals often display several numbers that look alike but measure different things. PV array capacity is stated in kWp DC. Hybrid inverter power is stated in kW AC. Battery energy capacity is stated in kWh. Protected-load demand is stated in kW and may have a higher short starting demand. Do not put a single “5 kW system” label across all four. The buyer may assume a 5 kW battery when the number actually describes panels or inverter output.

The quote should name module make, model, wattage and count; hybrid inverter make, model and rated output; and battery manufacturer, model, chemistry, rated energy and usable-energy basis. A battery capacity stated at one operating condition may not equal energy delivered at the AC output after reserve and conversion losses. Record the manufacturer's allowed operating window and relevant output limits for the exact model. If the battery or inverter is provisional, mark it and set out the substitution approval process.

The system flow may be explained as PV array → hybrid inverter ↔ battery → protected-load panel, with the grid connected through the inverter's approved arrangement. That is a conceptual diagram only. It is not a wiring instruction. Actual protection, isolation, changeover and grid interaction must follow the selected equipment and applicable electrical rules. If the system will export electricity, specify the utility connection and metering scope separately. If export is not part of the design, do not imply it is.

Build a load schedule before quoting backup hours

A useful load schedule lists each backed-up load, its running power, expected hours and any motor or compressor start condition. Measure where possible, and flag estimates. A label on an appliance may give a maximum rating that differs from its usual draw. The design must still survive relevant peak demand, not merely the average energy calculation.

Protected loadRunning power inputPeak/start checkHours requestedInclude?
Lighting circuit[measured or rated W][ ][ ][yes/no]
Fans[measured or rated W][ ][ ][yes/no]
Wi-Fi / router[measured or rated W][ ][ ][yes/no]
Refrigerator or pump[measured or rated W]Check starting behaviour[ ][yes/no]
Other[measured or rated W][ ][ ][yes/no]

This table uses placeholders, not sample measurements. The customer and installer should agree on the list. Add a note if the customer may add future loads. A quote based on today's protected panel cannot promise the same runtime after new appliances are added to that circuit.

A transparent duration calculation

A first-pass energy estimate is usable AC battery energy (kWh) ÷ average protected load (kW) = hours. The units work: kWh divided by kW gives hours. The hard part is establishing usable AC battery energy. It depends on the selected battery's usable state-of-charge range, battery condition, inverter conversion, operating reserve and the permitted discharge power. Solar charging during the outage, changing loads and temperature also affect real duration. The NREL operations and maintenance guide discusses depth of discharge, state-of-charge constraints, cycling and temperature as battery-performance considerations. The US Department of Energy's storage assessment describes rated energy duration as rated energy divided by power.

Do not insert a fixed efficiency or depth-of-discharge percentage because “most lithium batteries use it.” Use the chosen manufacturer's current datasheet and settings, then show your assumptions. If the connected load can spike above the inverter's backup output or battery discharge limit, the nominal energy calculation is irrelevant for that event. A modest average load can still trip a system when a compressor or pump starts.

If a customer wants a simple statement, write “Estimated backup for the protected loads listed above is [range] hours, assuming [initial charge], [average load], [reserve setting], [battery condition] and no material change in loads. Actual runtime varies.” Fill those fields only when you have measured or otherwise defendable inputs. If you cannot yet support a range, state that runtime will be confirmed after load measurement and model selection. A blank runtime line is preferable to a false promise.

Quote the battery as a system, not one box

A battery line should include manufacturer, model, chemistry, nominal and usable capacity where documented, quantity and relevant warranty. Add compatible inverter or battery-management equipment if not included. Then price the protected-load distribution board, changeover or backup circuit work, cable and protection, installation, commissioning and user handover. If the existing home wiring needs alteration, show it. If it is excluded pending inspection, say so.

Cost lineWhat to specifyCommon omission
Hybrid inverterExact model, output and compatible battery scope.Assuming a grid-tied inverter can be reused unchanged.
BatteryExact model, rated/usable kWh, quantity and written warranty.Quoting only a nominal kWh number.
Protected-load panelCircuits, breakers and segregation work.Claiming backup without defining what remains connected.
Changeover and protectionReviewed equipment and installation task.Ignoring isolation and integration cost.
Monitoring and setupAccount setup, settings and customer instruction.Leaving the customer unable to understand reserve and alarms.

The battery's warranty may be held by its manufacturer or supplier rather than the software company making the quotation. Quickest Solar CRM sells quoting and lead-management software. It does not manufacture the battery or assume a battery warranty. Put the actual equipment supplier's written warranty in the customer document and separate your own installation or service commitment.

Handle tax and subsidy carefully

The Excel file has a blank GST rate field for each cost line. Enter the correct rate only after checking the goods, services, supply structure and current notification. The GST Council's September 2025 release says specified renewable energy devices and parts for their manufacture moved from 12% to 5%, with relevant changes effective 22 September 2025 according to the Council FAQ. That announcement does not establish one rate for every battery, inverter, installation and electrical-work line in your hybrid quote. Verify classification and contract treatment with a tax adviser. Do not copy a rate from an old on-grid quotation.

If the customer is an eligible residential PM Surya Ghar applicant, any central financial assistance line should be indicative and separate from your contract price. The MNRE residential CFA guidelines tie the scheme to a National Portal application, registered vendor, installation, document submission, inspection and approval. Check whether the chosen hybrid design and components satisfy the current scheme requirements; do not infer eligibility from the word “hybrid.” Do not automatically reduce the amount payable by an unapproved estimate. Guidance checked 23 November 2026.

For a commercial hybrid job, remove the residential subsidy line unless a different specific programme has been verified for that buyer. A generic “government subsidy” row is not useful. The buyer needs a clean contract amount, any tax position and any separately evidenced incentive, each with its own source and conditions.

State what the system will do when the grid fails

The backup description should name the protected circuits, any automatic or manual transfer process, behaviour when the battery reaches its reserve, and what happens when grid power returns. Use the exact inverter and installation design to write this. Some systems may continue charging from PV in certain islanded conditions; others have model or configuration limits. Do not make a general claim from a product category label. Confirm the selected equipment's documentation and settings before making a customer promise.

Explain maintenance and operation in terms the user can follow. Who changes reserve settings? What alarms should prompt a call? Is there a periodic check? If you include remote monitoring, say whether it needs internet at the site. If the customer can accidentally add a large load to the backed-up circuit, point out the limit. A short handover demonstration can prevent a dispute over a design that behaved exactly as specified but differently from what the buyer expected.

The installation timeline should identify electrical shutdowns and customer access needed for protected-panel work. Separate your tasks from utility approvals. If the job combines a new grid connection with storage, set out which parts can proceed before the utility step and which cannot. A hybrid system is often bought for reliability; that does not remove the need for clear acceptance tests and commissioning records.

Write the commercial terms around the actual risk

Use a calendar validity date and a revision number. Name payment milestones and make sure their amounts add to the contract total. State whether battery delivery, electrical work and commissioning are separate milestones. If the final load survey changes the selected battery or inverter, describe how you will price and approve the change before ordering equipment.

Put exclusions beside the total. For example, the quote may exclude rewiring outside the protected panel, a generator interface, roof repair, extra battery modules, a load upgrade or utility charges. Include only real exclusions for this job. Avoid “all other work extra,” which tells the customer very little. If a needed safety or integration task is excluded, identify who will do it before commissioning.

Warranty terms need exact models. Distinguish module, hybrid inverter, battery and installer workmanship warranties. For the battery, record whether the written terms depend on operating temperature, throughput, cycles or state-of-charge settings. The NREL O&M guide notes that operating depth and temperature can affect battery life and warranty conditions. Use the manufacturer document for the selected product as the final source of customer-facing coverage. Never copy a period from a similar battery.

Review the exported quote before it leaves your phone

Fill the file, check the system summary and price schedule, then export a PDF. Read the exported document on a phone before sharing. Check that the battery energy is labelled kWh, inverter power is kW, PV size is kWp and backup duration is conditional. Check the protected-load list and exclusions. A customer who sees “5” without a unit cannot know which component it describes.

For a revised option, keep the original reference and add a revision. If you offer “essential loads” and “larger backup” choices, give each a separate battery specification, price, load list and runtime basis. Do not show one shared backup promise over both options. Keep the version you sent, the customer's acceptance and any change order in the project record.

The downloadable format is free to use without a Quickest account. To create branded PDFs and share them through a repeat workflow, see the quotation system or create an account. Check current account terms before signing up. For a workflow question, message Quickest on WhatsApp.

Questions about hybrid quotation formats

Can I state a fixed number of backup hours?

Only if you define the protected loads, initial charge, usable-energy basis, reserve and equipment limits that support the estimate. Even then, describe it as conditional and allow for changing loads and battery condition. Do not turn a kWh nameplate value directly into a guaranteed duration.

Is battery capacity the same as inverter capacity?

No. Battery capacity is energy in kWh. Inverter capacity is power in kW. Both matter: the battery needs enough usable energy for the requested duration, while the inverter and battery discharge path must support the simultaneous load and starting conditions.

Can I use this format for a standard on-grid job?

Use an on-grid quotation format if there is no battery or protected-load design. The hybrid fields exist to make storage, changeover and backup scope explicit. Leaving those lines blank in a customer quote creates confusion.

Should I include a subsidy amount for the battery?

Do not assume a hybrid battery or its full price is eligible under a residential scheme. Check the current MNRE rules and the customer's specific application. Show only an evidenced, conditional amount separately from the contract payable. If the scheme does not apply, remove the line.

What is the last check before sending?

Match the equipment models to current datasheets, inspect the protected-load schedule, calculate totals and tax using verified inputs, check actual warranty wording, and open the final PDF on a phone. Then send the customer the exact version they can accept.