Rules checked: 23 November 2026. This guide concerns the central PM Surya Ghar: Muft Bijli Yojana assistance for eligible residential rooftop systems. Check the current National Portal, relevant DISCOM process and project documents before making a final offer.
If a household wants to claim the central rooftop solar assistance, quote a system using DCR compliant modules made with domestically manufactured cells and verify the actual module credentials. If the household chooses a system without that assistance, a non-DCR module may be an option, subject to the rules that apply to that project. Do not put an estimated subsidy under the non-DCR option and call it the customer's net price. MNRE's operational guidelines say that using a non-DCR module in any form makes an installation ineligible for central financial assistance under this scheme. The same guidelines say consumers who install without claiming that assistance may use modules that do not meet DCR. MNRE operational guidelines, 7 June 2024, as amended 7 July 2025.
If you need to present both specifications in one offer, the three-option quotation method shows how to make each difference visible to the buyer.
That is the decision your quotation should make visible. Put two complete systems side by side, with their own module make and model, capacity, scope, price, eligibility statement and payment figure. Keep everything else as comparable as the site and design allow. Give the customer a genuine choice. Do not turn a DCR comparison into a vague promise that every locally branded panel earns subsidy.
The practical starting point is a quotation with two clearly labelled options. Use the field checklist below in your own document, so the buyer can compare equipment, price, scheme conditions and responsibilities.
What DCR means in this quotation
DCR means Domestic Content Requirement. In this particular residential assistance scheme, the requirement is about the solar modules and the cells used to make them. MNRE says the modules must be domestically manufactured from domestically manufactured cells. A module assembled in India does not automatically satisfy the requirement if its cell origin fails that test. A product name containing “Made in India” is not a substitute for the required scheme credentials. MNRE's March 2025 clarification gives further detail on what counts as a domestically manufactured crystalline silicon cell. MNRE DCR cell norms, 11 March 2025.
Do not mix DCR with ALMM. ALMM is an approved models and manufacturers framework with its own scope and dates. DCR is a domestic content condition in particular schemes. A module's appearance on an ALMM list, by itself, does not settle whether the offered module has verifiable DCR credentials for a PM Surya Ghar job. MNRE's 2026 ALMM amendment expressly leaves scheme-specific DCR obligations in place. MNRE ALMM amendment, October 2026.
If you only need the term defined, see our DCR glossary when that page is live. The rest of this guide is about the sales decision: which module option to offer, what to prove and what to write on the quote.
First ask what the customer wants to claim
The phrase “subsidy panel” hides several questions. Is this a residential electricity connection? Has the customer applied through the PM Surya Ghar National Portal? Is the customer seeking central financial assistance, or comparing a self-funded purchase? What is the existing rooftop solar capacity, if any? Is the installation for an individual household or a common facility? Which DISCOM will inspect and connect it? Those answers affect the claim. The module brand alone does not establish eligibility.
The MNRE guidelines say central assistance is for the residential segment and not the commercial or industrial segment. They also describe the consumer's National Portal application, vendor selection, DISCOM inspection and the verification process. A sales rep should therefore avoid telling a factory customer that a DCR quote automatically comes with a PM Surya Ghar deduction. For a household, the quote can show an illustrative assistance amount, provided it is identified as conditional and checked against the current scheme, installed DC capacity and consumer's situation. MNRE operational guidelines.
Ask whether the household has already used assistance for rooftop solar. An expansion can have a different eligible balance from a new system. The MNRE guidelines include examples of additional assistance only for the balance of capacity up to the relevant limit. Do not carry forward a generic “3 kW subsidy” line from your old template without checking the customer's earlier claim. Also ask whether the owner is opting out of assistance. The guidelines explicitly permit a consumer to forgo it, including through the portal's “Give It Up” option. Those are separate buyer paths, not a cheaper and a dearer version of the same subsidised offer. MNRE operational guidelines, sections 5 and 6.
Use this short conversation before you promise a number:
- “Is this for your home's electricity account, or a business account?”
- “Do you want us to design the quote around a PM Surya Ghar application?”
- “Have you already installed rooftop solar or claimed central assistance for this account?”
- “Can we check the bill, consumer number, available roof and your DISCOM's current process before finalising the offer?”
- “Would you also like a no-assistance option so you can compare the full prices?”
These questions are faster than rebuilding a quotation after the buyer asks why the low-price option has no subsidy. Record the answers in the lead notes. If the buyer has not decided, present both paths as subject to verification, not as two guaranteed net prices.
Verify the DCR module before putting it in a subsidy quote
The module needs a traceable identity, not just a category label. Ask the supplier for the exact manufacturer, model, rated wattage, data sheet, warranty document, delivery availability and DCR verification evidence that applies to that model and batch. Match the documents to the modules that will actually be procured and installed. A quote that says “DCR panel” while leaving the make and model blank gives the buyer little basis to compare offers and creates a substitution dispute later.
MNRE's November 2024 memorandum says DCR compliant module data must be entered on the NISE DCR Verification Portal and that modules whose DCR credentials cannot be verified there are not accepted under the named MNRE schemes from 1 December 2024. This makes verification a procurement step, not a marketing adjective. Keep a copy or reference of the verification with the job file, and repeat the check if the model changes before dispatch. MNRE DCR verification memorandum, 11 November 2024.
For a non-DCR option, identify the module with the same care. “Non-DCR” tells the customer nothing about power, warranty, technical suitability or approval requirements outside the central assistance scheme. Avoid implying that all non-DCR products are imported, lower quality or disallowed. Those claims require evidence for the exact product and project. The honest distinction in this quote is the scheme's domestic-content condition and the resulting assistance pathway.
Build two comparable options, not two misleading totals
A comparison works only when the customer can see what changed. Keep the site, roof area, target DC capacity, inverter requirement, installation scope and connection work aligned wherever possible. If the non-DCR module has a different wattage, number of modules or footprint, show the effect on DC capacity and roof layout. If one option has a different warranty, structure or monitoring package, put that difference in its own row. Do not attribute every rupee of a total-price change to DCR status when the bill of materials changed as well.
| Quotation field | Option A: DCR pathway | Option B: no-assistance pathway |
|---|---|---|
| Intended buyer choice | Seek PM Surya Ghar assistance, subject to eligibility and verification | Purchase without claiming PM Surya Ghar assistance |
| Solar module | Exact maker, model, wattage and count; record DCR verification evidence | Exact maker, model, wattage and count; state relevant project approvals separately |
| Installed DC capacity | Calculate from module wattage × count | Calculate separately; explain any difference |
| Inverter and balance of system | Make, model, quantity and scope | Same specification where practical, or mark changes |
| Installation and connection | Itemised works and exclusions | Itemised works and exclusions |
| Gross contract price | Your dated supplier and labour inputs | Your dated supplier and labour inputs |
| Central assistance | Conditional estimate only after checking consumer and current scheme | Not included or deducted |
| Customer payment | Contract payment schedule; show possible assistance separately | Contract payment schedule without an assistance deduction |
| Validity | A defined date and treatment of a module substitution | A defined date and treatment of a module substitution |
The table is a structure, not a sample market quotation. It contains no market prices because a valid price comparison needs dated, like-for-like offers from actual distributors in the installer's geography. Module rates change, and a model may be unavailable when the order is placed. Obtain two supplier quotes on the same day where possible, with tax treatment, freight, credit terms, wattage and quantity visible. Then calculate the customer-facing totals from the complete system cost, not a guessed “DCR premium per watt”.
For example, if a supplier quote is expressed per module, the module subtotal is quoted price per module × number of modules. If it is per watt, first calculate module rated watts × quantity, then multiply by the price per watt. Keep freight, insurance, taxes and installation as separate inputs or show exactly where each is included. The arithmetic is simple; the difficult part is making sure the two offers cover the same deliverable. Do not publish a “typical” rupees-per-watt gap from one old purchase order.
Show assistance without turning it into a discount
The assistance belongs to the scheme process. It is not an unconditional rebate the installer can promise at invoice time. The guideline describes an e-token and disbursal after documents and DISCOM inspection. The customer's payment schedule and the scheme's possible assistance should therefore appear in separate lines. Even where a financing arrangement changes the destination of a payment, it does not make eligibility automatic. MNRE operational guidelines, processing and disbursal.
A useful note under the DCR option is: “Estimated central financial assistance is shown for comparison only. Final eligibility and amount depend on the current PM Surya Ghar rules, National Portal application, installed module capacity, verified DCR credentials, documents and DISCOM inspection. It is not a discount on this contract price.” Adjust the note to the actual consumer and have your legal and commercial team approve it. For the non-DCR option, write: “No PM Surya Ghar central financial assistance is included in this option.” These are drafting examples, not legal advice or a substitute for the scheme terms.
Do not claim that a DCR module guarantees assistance. A valid module is one necessary condition among several. The buyer still needs the right consumer category, compliant installation, portal process and verification. Equally, do not suggest that a non-DCR system is illegal for every Indian roof. The operational guideline itself distinguishes consumers who install without assistance. Other applicable technical, interconnection and procurement rules still need checking for each project.
If the customer asks whether a system above 3 kW is “non-subsidy”, explain that the guideline caps the central assistance calculation; it does not say that a larger residential system using non-DCR modules can still claim assistance on its first 3 kW. A system seeking assistance must satisfy the DCR condition throughout the installation under the cited guideline. The capacity and assistance calculation is a separate question from module eligibility. MNRE operational guidelines, CFA structure and DCR condition.
Put the differences where the buyer will see them
Many quotes hide the critical distinction in a paragraph of terms. Put it near the prices and the module schedule instead. Use labels such as “Option A: DCR compliant modules, assistance application planned” and “Option B: non-DCR modules, no central assistance shown”. The labels are specific enough for a customer reading a PDF on WhatsApp. Then put the detailed conditions below the option table.
Make the line items readable on a phone. Name the module and inverter rather than only saying “solar panel” and “solar inverter”. State whether mounting structure, cabling, protection, earthing, net-metering application support, meter charges and civil work are included. A single “3 kW solar system” line makes an apparently cheap option hard to evaluate. It also prevents a fair comparison with another installer who has explicitly priced the connection work.
Give each option its own gross price and milestone schedule. If you display a possible assistance amount for Option A, label it estimated and conditional and show the gross contract amount alongside it. Do not put that estimate in a “discount” column that reduces the supplier invoice. Keep any state top-up out of the quote unless you have checked the current state rule, consumer qualification and process. This matters particularly when one salesperson uses a generic template across multiple states.
Your validity and substitution terms should be just as visible. A customer may accept a DCR quote and later find that the exact module is unavailable. The contract should say how a replacement model will be proposed and approved, how DCR evidence will be checked again, and whether a price revision needs written acceptance. It should not permit a silent swap from a DCR compliant model to an unverified alternative. A quote is useful when it prevents that dispute before the order is placed.
A pre-send check for the installer
Before sending the PDF, ask a colleague to read it as though they were the household owner. Can they identify which option is intended for an assistance application? Can they see the exact module in each option? Can they tell whether the two capacities are the same? Is the possible assistance separate from the contract price? Is the buyer's actual payment obligation clear? Are the inclusion, exclusion and validity terms easy to find? If any answer is no, revise the document before you send it.
Then check the operational file. Confirm the bill and consumer category, roof information, supplier documents, module verification, current scheme and DISCOM requirements. Save the version of the quote that went to the customer, along with the date and module evidence. If the customer later asks for a third option, issue a revised version rather than overwriting the first PDF without a record. A careful paper trail protects the buyer's decision as well as your team’s pricing.
The quotation system feature page shows how Quickest prepares a customer proposal. The software does not verify DCR credentials or decide scheme eligibility for you; the installer must supply and review the correct inputs.
Where Quickest Solar CRM fits
Quickest Solar CRM can produce a branded quotation PDF with your logo, items and terms, show a PM Surya Ghar assistance line, and share the PDF on WhatsApp. Check those features with a sample proposal before using the app for customer quotes. The app is a place to present the decision and keep the customer follow-up; it cannot turn an unverified module into a compliant one or approve a government claim. Put the exact module and eligibility note into your own approved quote content before you share it. Keep the supplier evidence and portal checks with the job record outside the customer-facing price table.
Use the same field order for both options, whether you work in Word, Excel or a quoting app. If you want to build the quote in Quickest, start free, then inspect the PDF as a customer would before sending it.
The best quote is not automatically the one with the lowest displayed “after subsidy” number. It is the one that states what the customer is buying, what assistance they may pursue, what has been verified, and what they will pay if that assistance is not approved. If you can make those four points clear on one screen and one PDF, the buyer can compare the options without relying on a sales call to decode them.
Questions customers may ask
Can a non-DCR module be used if the customer does not want central assistance?
The MNRE guideline says consumers who install without availing assistance under this scheme may do so without DCR modules. That does not waive other rules that may apply to the project. Check the relevant DISCOM and technical requirements before finalising the design. MNRE operational guidelines.
Is an Indian brand automatically a DCR module?
No. The scheme condition concerns domestically manufactured modules made from domestically manufactured cells, and MNRE requires verification of DCR credentials. Ask for the exact model and evidence rather than relying on the name on the carton. MNRE DCR verification memorandum.
Should the quote display a net price after assistance?
You may show a conditional comparison, but keep the gross contract price and actual payment schedule prominent. Label the possible assistance as an estimate subject to eligibility, process and inspection. Never show it as a guaranteed installer discount.
What if the DCR module changes after the customer accepts?
Issue a revised module schedule, repeat the DCR check and obtain the customer's written acceptance for any specification, price or timeline change. Keep the old quote in the job file. This is a sensible commercial workflow, not a substitute for the terms agreed in the signed contract.
Is a DCR option always more expensive?
Do not promise a fixed direction or size of price gap. Compare two dated supplier offers for the exact models, quantity, delivery location, tax and freight terms. The complete installed system may differ for reasons besides module origin. Present the actual difference and its causes in the quotation.