An on-grid rooftop quote needs to make the grid connection work visible. The customer is buying more than panels and an inverter. They need to know who handles the utility application, meter, testing and commissioning, and which charges sit outside your price. Use this on-grid solar quotation format in Excel, Word or printable PDF to put those decisions in one document. The files are blank, editable where appropriate and ungated.
The format has separate rows for the PV array, grid-tied inverter, mounting, protection, installation, application support, meter-related work and other approved tasks. It has no battery or backup promise. GST rate inputs are blank so you can check the classification and treatment of your actual supply. Any residential subsidy appears separately as an indicative amount, subject to eligibility and approval. Replace every bracketed field before you send a customer copy.
If you prefer to make a branded quote from your phone, see Quickest Solar CRM's quotation system. Check current account terms before signing up. Create an account after you have checked the job's inputs.
Download the on-grid quotation format
| Format | What it helps you do | What it does not do |
|---|---|---|
| Excel | Calculate item amount, entered GST and total payable from your rates. | Decide tax classification or utility charges. |
| Word | Edit connection responsibilities, exclusions and payment wording. | Recalculate typed totals automatically. |
| Check the blank structure or take a printable field sheet to site. | Serve as a finished customer offer until completed. |
This page is for an on-grid system connected to the electricity distribution network. It is different from the general solar quotation format, which leaves the connection route open, and different from a guide explaining on-grid, off-grid and hybrid systems. The point here is to produce an actual on-grid offer with the utility work and costs named.
Identify the connection before choosing a price
Record the customer name, site address, electricity consumer number, distribution utility, tariff category, connection type, phase and sanctioned load where these matter. Check whether the account holder, property owner and person signing the quotation are the same person. If not, the application and consent documents may need more work. Do not promise a connection route solely from a module capacity. The utility's current process and the consumer's existing connection govern what is possible.
The site survey needs the roof area, layout constraints, orientation, shading, access, mounting surface, cable path and main distribution board location. A verbal “there is space for 3 kW” is not a survey. If the roof needs structural review or repairs, record that as a dependency. If the quote is subject to final survey, put that condition near the system summary and set out how any revised scope will be approved.
For a residential PM Surya Ghar application, the MNRE operational guidelines describe the National Portal route, vendor installation, document upload and DISCOM inspection. They explain that a DISCOM may require documents under existing state rules during implementation and that inspection and portal approval matter for CFA. Check the current version for the customer's utility and application date. Rules checked 23 November 2026.
A short pre-quote checklist
| Question | Evidence to request | Quote consequence |
|---|---|---|
| Who owns the connection? | Recent bill and account holder details. | Determines the application path and signatory. |
| Which utility serves the site? | Bill and service address. | Determines the applicable forms, meter process and charges. |
| What is the existing load and phase? | Bill, connection record or utility portal. | May affect feasible capacity or a load-change task. |
| What roof can be used? | Measured survey and photos with permission. | Determines layout, structure and cable scope. |
| Is a subsidy claim planned? | Customer category and portal application status. | Requires separate eligibility and process wording. |
Do not turn the checklist into a claim that approval is automatic. An application can depend on the consumer's documents, the utility's process and the system that is actually installed. The quote should name who does each task and whether the utility's fee is included, provisional or paid directly by the customer.
Describe the on-grid system accurately
An on-grid quotation should label module capacity in kWp DC and inverter capacity in kW AC. Give the proposed module and inverter make, model, count and rating. If the final model is subject to availability, say which alternatives are permitted and how the customer will approve a substitution. Do not promise a brand and quietly install a different model.
The system flow is simple at the sales level: PV modules → DC protection → grid-tied inverter → AC protection → customer electrical system → grid connection and meter. That is a conceptual explanation, not an electrical single-line diagram. The final design must address cable sizing, earthing, protection, grid requirements and utility conditions. If your offer includes drawings and approval documents, list them. If it does not, state the party responsible.
A standard grid-tied inverter normally follows grid conditions and does not by itself create household backup during an outage. If the customer wants backup power, do not imply that a plain on-grid quotation includes it. Quote a separately designed hybrid or backup arrangement with an identified battery and protected loads. This avoids the common situation where the buyer sees “solar” and assumes the lights will stay on during a grid failure.
The quote should also say which monitoring features are included, if any, and what the customer receives at handover: app login, Wi-Fi setup, commissioning record, equipment documents or training. Do not list a remote monitoring promise if the selected inverter or site connectivity has not been confirmed.
Put meter and DISCOM work on its own lines
On-grid jobs often stall where the equipment quote ends: application, meter, inspection and commissioning. A buyer needs to know which steps are included in your fee and which are authority charges. Use separate rows for application support, meter or metering-related work, utility inspection/commissioning coordination, and customer-paid utility charges where relevant. Do not invent one national “net meter fee.” Charges, processes and responsibility can vary by state, utility, customer category and connection.
| Line in the format | What to specify | Common ambiguity to remove |
|---|---|---|
| Application support | Portal or utility forms you prepare, documents you collect, and the party who submits. | “We handle approvals” can sound like you guarantee the decision. |
| Meter-related work | Whether meter supply, replacement, testing or installation is in your scope. | Some charges may be utility-billed and outside your quote. |
| Inspection coordination | Site readiness, attendance and rectification tasks you will perform. | Inspection date and approval are not fully within your control. |
| Utility charge allowance | Exact charge if verified, or a marked provisional amount. | A guessed fee can make the quoted total misleading. |
| Customer prerequisites | Bill, consent, ownership or other required documents. | A missing document can delay the process. |
The MNRE guidelines discuss DISCOM inspection, agreements, checklist review and portal approval. Confirm the current local requirement; do not assume a process seen in another state. For example, Gujarat publishes its own technical regulations and amendments. That illustrates why a single national sentence cannot settle a local quote. The Gujarat index is an example, not a rule for sites outside Gujarat.
Build a price schedule the customer can compare
The workbook starts with quantity and unit rate for each item, then calculates a taxable line amount. Enter a verified GST rate for each relevant line; the workbook calculates tax and sums the total payable. It does not choose the rate for you. A practical on-grid schedule may include PV modules, inverter, structure, DC cable and protection, AC protection and integration, installation, testing, application work, and a clearly identified allowance for any utility task you have priced.
Separate included work, optional work and excluded work. If roof strengthening is necessary but outside your price, show that prominently. If an existing panel must be modified, say whether your electrician will do it. If the meter charge will be billed directly by the utility, write that it is customer-paid rather than placing a false zero in your total.
The GST Council's September 2025 release states a reduction from 12% to 5% for specified renewable energy devices and parts for their manufacture, with relevant changes effective 22 September 2025 per the Council FAQ. That does not mean the entire equipment, installation and utility schedule takes one rate. Check the exact classification and treatment of the contract with a qualified adviser and current CBIC notifications before sending a tax-inclusive quote. The blank GST cells force that check instead of copying a rate from an old file.
A calculation example without a made-up rate
Suppose a line has quantity Q and a unit price P. Its taxable amount in the sheet is Q × P. After you enter the GST rate that applies to that line as R, the tax is Q × P × R. The customer-facing line total is the taxable amount plus that tax. The workbook sums all taxable lines and tax lines for the total payable. The formula can catch arithmetic errors, but it cannot tell you whether the chosen products, rates or quantities are right.
If a supplier gives a price that already includes tax, do not drop it straight into a “unit price before GST” cell. Separate the tax correctly or change the workbook structure, then recheck the final output. If a provisional item is subject to later measurement, label it provisional and state how the final amount will be approved. A customer should be able to see the difference between a fixed offer and an allowance.
Keep subsidy separate from the contract price
For an eligible residential customer under PM Surya Ghar, you may show an indicative CFA in a separate section. Label it “subject to eligibility, actual installed capacity, scheme rules and approval.” The MNRE residential CFA guidelines tie the process to a National Portal application, registered vendor, completed installation, document submission, DISCOM inspection and approval. The amount and disbursement path are not established by a quotation alone.
Keep total contract payable and indicative CFA visibly separate. Do not subtract an unapproved estimate from the total payable unless your signed customer payment arrangement expressly provides for a valid adjustment. The scheme may disburse to the consumer or loan account under its terms. Explain who pays your milestones and when. If the customer category is ineligible, remove the subsidy line. An on-grid system is not automatically a subsidised system.
If you show a post-subsidy illustration, present it as an illustration using the current scheme version and the customer's specific inputs. Record the date of the source you checked. The figure should not replace the actual payment schedule. The customer's decision is easier when they can see the purchase price first and the potential assistance second.
State the scope and timeline of grid connection
Write the installation sequence in plain words: design confirmation, order, roof and electrical preparation, mounting and wiring, testing, application or utility submission, inspection, meter process and handover. Assign responsibility to the installer, customer and utility for each step. If a milestone depends on the utility, do not write a guaranteed date unless you have a basis and a contractual plan for delays.
Your payment milestones should match the work. A booking payment may fund materials; a later payment may follow physical installation; a final amount may depend on testing or agreed handover. State the exact event and amount. Check that milestones add to the total payable. Clarify whether utility fees are part of that total or paid separately. Do not make the customer infer this from an invoice issued months later.
State the quote validity with a calendar date. Module and inverter prices can change, but that is not a reason for an open-ended unilateral increase. Explain how a change after expiry or a change in scope will be proposed and accepted. Keep a revision number so the team can tell which version the customer approved. Attach actual warranty documents or quote their exact terms for the selected models; do not put a generic warranty badge in place of written coverage.
Check the file before it goes to WhatsApp
Once the customer data and amounts are filled, export the final version as a PDF. Open that exact PDF on a phone. The item table, totals and exclusions should still be readable. Check that the quote number, date, site, DC and AC capacities, models, tax, meter scope, validity and payment terms survived the export. If a page is cut off or a cell shows a formula error, fix the source and export again.
Send one clear message with the PDF and the next action: “Please review the system, included utility work and payment terms. Reply with questions or confirm this quotation reference by [date].” Keep the sent version. If the customer requests a change, issue a revised PDF with a new revision label, rather than editing the old one in place.
Quickest Solar CRM can generate a branded proposal PDF with your logo, items, terms and product photos, show a subsidy line and share it on WhatsApp. Those features can reduce the manual file handling in a repeat workflow, but you still need to confirm the job's engineering, tax and utility facts. The product is available on Android, iOS and web. See the quotation workflow or create an account. Check current account terms before signing up. ## Questions about on-grid quotation formats
Should the quote include the net meter price?
It should state who pays for any meter-related work or utility charge. Include a verified amount only when you know the current local charge and your role. Otherwise mark it as a utility-billed or provisional item and explain how the amount will be confirmed. Avoid a national flat fee.
Can I promise backup power from an on-grid system?
Do not make a backup promise from a standard grid-tied quote. If backup is required, define a separately engineered hybrid or storage solution, the protected loads, battery specification and changeover arrangement. The buyer should see that this is a different scope and price.
Should I show the PM Surya Ghar benefit as a discount?
No automatic discount belongs in the contract total. Show an indicative residential CFA separately, subject to eligibility and approval under the current scheme. Explain the customer's payment obligations in the signed terms.
What is the difference from the general solar quotation format?
This on-grid format makes application support, meter-related work, inspection coordination and customer-paid utility charges visible. The general format is useful when the system type or connection route has not yet been settled. Pick the format that fits the actual buyer task.
What is the safest final check?
Check the current utility process, confirm the chosen equipment and tax treatment, inspect the item total and payment schedule, and read the exported PDF at phone size. The version you send is the version the customer can accept.
Download the working file: Excel · Word · PDF. For a question about sending a branded on-grid quote from your phone, message Quickest on WhatsApp.