A solar quotation needs an expiry date because the offer depends on module availability, equipment price, installation scope and a place in your team's schedule. There is no useful number that fits every installer and every job. Choose a period you can actually support, state the calendar date, and explain what happens if the customer accepts after it. For a straightforward residential job with current supplier prices, seven, fifteen or thirty days are possible commercial choices. The right period depends on how long your supplier will hold its offer, how settled the site scope is, and how quickly the buyer can decide.
The wording matters as much as the number. “Valid for 15 days” leaves a buyer asking when the clock started and whether an advance paid on day sixteen affects the old price. Record an exact expiry date, time and time zone, then have your commercial or legal reviewer settle the actual acceptance and post-expiry terms used with customers.
Put a validity field alongside scope, payment and change terms in your own quotation. The examples below are drafting aids for your legal and commercial review. They are not a universal contract or legal advice.
What quotation validity actually protects
Validity is the period during which you are willing to make the described offer on the described terms. It is not a promise that a customer can reserve a particular module for a month without an order, nor a rule that lets you change an accepted price whenever a distributor updates a list. Those questions need separate stock, acceptance, advance and variation terms. If you treat all four as one “subject to change” line, the document becomes difficult for a buyer to trust.
Write the specific things the offer assumes. A typical residential quote might be based on the roof measurements available at the site visit, the visible electrical connection, the listed module and inverter model, and the installer's current supplier quotation. It may exclude hidden roof repairs, additional civil work, a service connection upgrade or charges set by another party. If a later survey changes one of those assumptions, the quote needs a documented revision. An expiry date alone cannot explain a scope change.
Validity also gives your sales team a reason to follow up with useful information. One day before expiry, ask whether the customer needs clarification on equipment, payment or installation timing. Do not send a pressure message implying that a government benefit disappears tomorrow unless that deadline has been verified from the current official rule and truly applies to that customer. A good reminder makes the decision easier; it does not invent scarcity.
Keep two dates separate: the quotation validity date and the proposed installation timeline. The first says how long the offer remains open. The second says when work may begin or finish after an accepted order, subject to site readiness, supply and approvals. A customer may accept a quote within validity yet need to schedule installation later. If your business cannot hold the price until that date, explain the condition before acceptance rather than discovering it afterwards.
Seven, fifteen or thirty days: choose from your inputs
Treat the period as a risk decision for your particular job. Ask the supplier how long the exact module and inverter offer is valid. Check whether the quoted quantity is actually available, whether delivery is included, and whether the price assumes a particular payment date. Check your own installation calendar and the amount of engineering still unresolved. Only then select the customer's deadline.
| Period | When it may fit | Main risk to manage | What the buyer should see |
|---|---|---|---|
| 7 calendar days | Supplier offer is short, the scope is settled, and the buyer can decide quickly | Buyer may need more time for financing or family approval | Exact expiry date, named components, and a simple re-quote path |
| 15 calendar days | Supplier price can be supported for about two weeks and the decision involves more than one person | Equipment availability may move during the period | Exact expiry date and a stock/alternative component rule |
| 30 calendar days | Procurement or your own inventory supports a longer offer | A vague quote can expose you to changed equipment and scope | Exact expiry date, what is reserved if anything, and written change control |
These are examples of commercial choices, not industry norms or legal defaults. The table does not mean a seven-day quote is always safer or a thirty-day quote is always more customer friendly. A supplier may quote one item for thirty days and another for three. The shortest binding input may decide your period unless you are willing to carry the difference yourself. Conversely, if you already own the equipment, a longer validity period could be practical. Write what you can deliver, not the round number copied from an old template.
Do not use “working days” without defining which holidays count. If you mean calendar days, say so. Better still, write the date and time in IST. If the quote is dated 23 November 2026 and valid for fifteen calendar days, calculate the actual end date in your document and check how your business counts the issue day. You can avoid the whole counting dispute by stating the final timestamp directly. Save the sent PDF so the issue date and version cannot be confused with a draft.
Decide what the validity section must cover
A reviewed validity section should answer five questions. What version of the quotation does it cover? When does it expire? How does the buyer accept it? What happens after it expires? Which events require a revised written offer even before expiry? You may not need all five in one sentence, but they should be easy to find together. The legal effect of acceptance depends on the actual offer, payment and contract terms; a blog example cannot settle it.
Use this internal review checklist, rather than copying sample contract text into a customer document:
| Field to settle | Record for this job | Reviewer question |
|---|---|---|
| Offer identity | Quotation number, version, date, named scope | Does the acceptance identify the correct revision? |
| Expiry | Exact date, time and time zone | Do sales and the customer see the same deadline? |
| Acceptance | The company's approved signed-order and payment process | Do invoice and payment terms say the same thing? |
| After expiry | Whether a fresh written offer is required | Who may issue the new price and version? |
| Scope change | Equipment, capacity or site conditions that require a revision | Is the change process consistent with the signed terms? |
For an early-stage quote with an incomplete survey, make the missing roof or electrical facts visible in the scope schedule. If those facts are essential to price the project, consider sending a budget estimate first and a firm quotation after the survey. Calling an uncertain number a final price can create more trouble than allowing a few extra days of validity. Have a reviewer align the eventual customer wording with your invoice, payment and cancellation terms.
For a commercial rooftop job, you may need separate conditions for structural review, shutdown access, electrical interface, meter or utility approvals, payment security and procurement lead time. A short generic validity clause cannot cover these project risks. Keep the period clear, then attach a scope and assumptions schedule that the buyer's finance, facilities and procurement teams can evaluate.
Validity and a price-escalation clause are different
A quotation can simply expire and be replaced. A price-escalation clause addresses a different question: whether an agreed price can change after acceptance if specified inputs move under specified conditions. If you want such a clause, it needs a fair trigger, evidence, notice process and customer choice. Avoid adding a broad “prices may change at any time” line next to a firm validity date; the two statements pull against each other.
For a small residential job, a short validity period plus a fresh written offer after expiry may be easier for the customer to understand than a complicated escalation formula. For a long commercial procurement cycle, a carefully drafted escalation arrangement may be appropriate. In both cases, the customer must know what is fixed when they accept. A post-acceptance price change needs its own reviewed contract mechanism. Do not silently apply an escalation from a blog example to a signed contract.
Your internal price-list process also matters. A valid quotation should draw from a dated supplier cost and your approved selling price. If the sales rep uses an old module price but writes “valid thirty days”, the clause does not repair the margin error. Review the list before creating the PDF, and record the cost version behind it.
Re-quoting after expiry without starting from zero
When a quote expires, do not overwrite the sent version. Keep its number, issue date, customer, system configuration and price in the record. Start a revision with a new version number and date. Reconfirm the bill or load, roof and electrical assumptions if enough time has passed. Ask the supplier to reconfirm the exact module, inverter, freight and taxes. Then check your installation capacity and any rule that your price or assistance illustration depends on.
Show changes in a short cover note. “Version 2 replaces quotation QE-104 version 1 dated 23 November. The module model changed from [model] to [model] because the earlier model is unavailable. The system capacity changed from [value] to [value]; the revised price is [value]. All other listed scope items remain as shown in the new quote.” Fill in real values. The buyer should not have to compare two long PDFs line by line to find the important change.
If the price is unchanged, say so. If the new price is higher, explain the actual input that moved rather than citing a vague “market increase”. If the buyer asked to change capacity, battery backup or structure type, mark that as a buyer scope change. Separate those from supplier price changes. This is more credible than one undifferentiated revised total.
Keep the old WhatsApp message or email and the revised one. If the customer replies to the old PDF, point them to the current version before taking payment. Where your team shares quotes in a group chat, assign an owner to confirm which version has been accepted. Version control is a sales task, not just a file-naming detail.
Put the clause where people can see it
Place the reviewed validity field next to the total price and acceptance action, then put the detailed approved terms nearby or point to them clearly. A buyer reading a quotation on a phone may never open the last page of legal text. The exact expiry timestamp should be visible without searching for it.
Use a quotation number and version on every page of a multi-page PDF. Include the customer's name and installation address, which may differ from the billing address. Put the module and inverter models near the technical schedule. If assistance is illustrated, mark it conditional and separately verify the current programme rules; quotation validity does not make that assistance guaranteed. Ensure the acceptance process and payment milestones do not contradict each other.
Before sending, test the clause against two situations. First, the customer accepts one hour before expiry but pays the advance on the next working day. Does your wording say what happens? Second, the customer asks to change the inverter after accepting. Does the document call for a revised written price? If the answers are unclear, edit the clause. A useful quote survives ordinary customer behaviour without requiring a sales manager to interpret a generic sentence.
How Quickest Solar CRM fits
Quickest Solar CRM can put your reviewed terms into a branded quotation PDF and share that PDF on WhatsApp. Your sales team still needs to record the expiry date, check the current equipment price and schedule its own follow-up before the offer expires. The software does not decide whether a supplier will honour a price or whether a clause is legally suitable for an order.
Start with a validity section that your business has reviewed, then enter it into your quote workflow. Review a sample output on a phone before using it with customers. You can create a Quickest account and check that the PDF shows the expiry date and time beside the offer.
The quotation system page shows how to prepare a customer-facing proposal. Use that link to see where the terms sit in the quote, not as a substitute for reviewing the commercial wording. An installer remains responsible for the offer it sends.
Questions that come up in sales calls
Is seven days too short?
It may be too short if the buyer needs a loan decision, committee approval or time to compare a technical scope. It may be reasonable if your supplier offer is short and the job is straightforward. Explain the reason and offer a re-quote path. Do not pretend that the period is an industry rule.
Is thirty days safer for the customer?
Only if you can support the offer for thirty days. A long period paired with a broad “price subject to change” term may give less certainty than a short, honest period. Check supplier terms and your own stock before choosing it.
Can I change the price before the expiry date?
That depends on the actual terms and whether the scope or equipment changed. The safe operational step is to document the reason, issue a revised quote and obtain acceptance before work proceeds. Do not rely on a blog clause to resolve a signed-order dispute; use your legal reviewer when the issue is material.
Does the validity date also fix the installation date?
No. State the proposed installation schedule separately, with the conditions that affect it. Acceptance within validity should not be presented as a guaranteed installation slot unless you genuinely reserve one.
Should I keep old quotations?
Yes, as an operational record. Save the PDF that was sent, the version and date, the supplier inputs used to price it, and any acceptance or revision. This lets the team answer a buyer's question about why the current offer differs from an earlier one.
A good validity clause is short because the underlying offer is clear. Choose a period you can uphold, write the exact end date, define acceptance and give the buyer a transparent way to receive a revised quotation. Keep the approved wording in your own terms document, and check every quote before it leaves your phone.
Want to put this into practice?
Keep your solar leads, proposal documents and follow-up tasks in one workflow.
Create account